What Should Be Included in a Primavera P6 Baseline Schedule?
A practical guide to the logic, coding, procurement, milestones, resources and narrative expected in a credible construction baseline schedule.
Discuss Your Project →A baseline schedule should explain how the project will move from notice to proceed through turnover. The software file is only one part of that deliverable.
Start With Contract Requirements
Review required software version, schedule level, calendars, coding, cost or resource loading, update frequency, narrative format and acceptance criteria before activity development begins.
Represent the Full Execution Plan
Include design, submittals, procurement, fabrication, delivery, access, construction, inspections, testing, commissioning and turnover where those activities can control field execution.
Use Complete, Defensible Logic
Activities should have meaningful predecessors and successors. Constraints, lags and open ends need a documented purpose because they can distort float and critical-path calculations.
Make the Schedule Manageable
Use WBS and activity codes that support the views the team actually needs: area, system, trade, responsible party, phase, work package and milestone.
Include a Basis-of-Schedule Narrative
Explain calendars, assumptions, planned sequence, critical path, key procurement items, resource strategy, constraints, risks and items awaiting owner direction.
Put the Schedule to Work